SourcingAI

Shale shaker price manufacturers

I have found results from400+products and200+suppliers aboutShale shaker price

High-Performance Oilfield Shale Shaker for Drilling Mud Treatment

High-Performance Oilfield Shale Shaker for Drilling Mud Treatment

US$10,000.00-25,000.00
1 Piece(MOQ)
Oilfield Drilling Fluid Water Based Shale Shaker with ATEX Certificate

Oilfield Drilling Fluid Water Based Shale Shaker with ATEX Certificate

US$10,000.00-25,000.00
1 Piece(MOQ)
Oilfield Drilling Durable Shale Shaker for Enhanced Mud Solid Control in Drilling

Oilfield Drilling Durable Shale Shaker for Enhanced Mud Solid Control in Drilling

US$10,000.00-25,000.00
1 Piece(MOQ)
Large Mesh Number Huge Capacity Shale Shaker

Large Mesh Number Huge Capacity Shale Shaker

US$10,000.00-25,000.00
1 Piece(MOQ)
Trflc500 Shale Shaker for Drilling Solids Control System

Trflc500 Shale Shaker for Drilling Solids Control System

US$10,000.00-25,000.00
1 Piece(MOQ)
Best Price Shale Shaker for Drilling Solids Control System

Best Price Shale Shaker for Drilling Solids Control System

US$10,000.00-25,000.00
1 Piece(MOQ)
Mongoose PT Shale Shaker with Three Motors

Mongoose PT Shale Shaker with Three Motors

US$900.00-2,000.00
1 Set(MOQ)
Drilling Mud Fluids Solids Control Shale Shaker

Drilling Mud Fluids Solids Control Shale Shaker

US$10,000.00-25,000.00
1 Piece(MOQ)
Shale Shaker for Drilling Mud Solid Control System

Shale Shaker for Drilling Mud Solid Control System

US$10,000.00-25,000.00
1 Piece(MOQ)
Dual Motion Shale Shaker for Solids Control System

Dual Motion Shale Shaker for Solids Control System

US$10,000.00-25,000.00
1 Set(MOQ)
High Efficiency Mud Shale Shaker for Oil Drilling Solids Control

High Efficiency Mud Shale Shaker for Oil Drilling Solids Control

US$10,000.00-20,000.00
1 Set(MOQ)
Ap1 Drilling Shale Shaker for Oilfield Screen Solid Control System

Ap1 Drilling Shale Shaker for Oilfield Screen Solid Control System

US$10,000.00-25,000.00
1 Piece(MOQ)
Oilfield Shale Shaker for Advanced Drilling Solids Control

Oilfield Shale Shaker for Advanced Drilling Solids Control

US$8,824.00-17,647.00
1 Set(MOQ)
Best Popular Mud Shale Shaker for Oil Drilling

Best Popular Mud Shale Shaker for Oil Drilling

US$10,000.00-25,000.00
1 Piece(MOQ)
Mud Linear Shale Shaker for Oil Field Solid Control System

Mud Linear Shale Shaker for Oil Field Solid Control System

US$10,000.00-25,000.00
1 Piece(MOQ)
Advanced Shale Shaker for Efficient Oilfield Solids Control

Advanced Shale Shaker for Efficient Oilfield Solids Control

US$40.00-100.00
1 pcs(MOQ)
Drilling Mud Solid Control Shale Shaker for Drilling Mud Cleaning Waste Management

Drilling Mud Solid Control Shale Shaker for Drilling Mud Cleaning Waste Management

US$12,000.00-25,000.00
1 Piece(MOQ)
Driling Shale Shaker with Shale Shaker Screen for Oilfield

Driling Shale Shaker with Shale Shaker Screen for Oilfield

US$10,000.00-25,000.00
1 Piece(MOQ)
Oilfield Drilling Mud Shale Shaker for Mud Equipment

Oilfield Drilling Mud Shale Shaker for Mud Equipment

US$10,000.00-25,000.00
1 Piece(MOQ)
Oilfield Drilling Fluid Water Based Shale Shaker with Screw Conveyor

Oilfield Drilling Fluid Water Based Shale Shaker with Screw Conveyor

US$10,000.00-25,000.00
1 Piece(MOQ)

Sourcing guidance for Shale Shaker Price

What are the key technical specifications to consider when evaluating Shale Shaker prices?

When comparing prices, you must look beyond the initial cost and evaluate the G-force capacity (typically 6.5G to 8.0G), as higher vibration intensity directly impacts fluid recovery and solids control efficiency. Ensure the unit features linear motion or dual-motion technology to handle varying drilling depths. Additionally, the deck angle adjustment range (usually -1° to +5°) and the total screening area are critical factors; a larger screening area justifies a higher price point by increasing throughput and reducing screen wear.

How do material choices and compliance standards affect the procurement cost?

High-quality shale shakers utilize SS304 or SS316 stainless steel for parts in contact with drilling fluids to prevent corrosion, which increases the price but extends the equipment lifespan. For hazardous environments, ensure the motors and control panels are ATEX or IECEx certified (explosion-proof). Compliance with API RP 13C standards for screen labeling and performance is non-negotiable for international oilfield operations, and sourcing from ISO 9001 certified manufacturers on Made-in-China.com ensures consistent welding and structural integrity.

What is the economic feasibility of different screen types and vibration motors?

The long-term cost of ownership is heavily influenced by the vibration motors (e.g., Martin or Oli brands); while premium motors increase the upfront price, they offer significantly higher MTBF (Mean Time Between Failures). Furthermore, check if the shaker uses pretensioned composite screens versus traditional metal frames. Composite screens, though more expensive initially, offer longer service life and better sealing, reducing the frequency of costly downtime and replacement parts.

Cross-Border Purchasing Considerations for Shale Shakers

What are the primary risks when importing heavy oilfield equipment like shale shakers?

The main risks include structural damage during maritime transit and non-compliance with local environmental regulations. To mitigate this, require the supplier to provide seaworthy vacuum packaging and steel-frame reinforcement. Always request a Pre-Shipment Inspection (PSI) or a FAT (Factory Acceptance Test) video to verify the vibration frequency and noise levels (should be below 85dB) before final payment.

How should I negotiate with suppliers on Made-in-China.com for better terms?

Focus on Total Cost of Ownership (TCO) rather than just the unit price. Negotiate for a spare parts package (including extra screens, springs, and rubber seals) to be included in the initial price, which can save 10-15% in maintenance costs. For bulk orders, aim for a progressive discount structure (e.g., 5-8% off for 5+ units) and request extended warranty periods (18-24 months) to ensure transaction security.

What logistics and shipping methods are recommended for this equipment?

Due to the weight and dimensions, FCL (Full Container Load) shipping is the most cost-effective and safest method. Ensure the supplier uses Incoterms 2020 like FOB or CIF to clearly define risk transfer. For inland transport to the final drilling site, confirm the equipment's lifting points and center of gravity are clearly marked to prevent accidents during crane operations at the port of discharge.

Related queries