SourcingAI

Foam pipe making machine manufacturers

I have found results from400+products and200+suppliers aboutFoam pipe making machine

Longkou Fuchang Packing Machinery Co., Ltd.mic-icon
Satisfies 1/1 of your requirement
LDPE Foam Pipe Machine/EPE Foam Rod Making Machine

LDPE Foam Pipe Machine/EPE Foam Rod Making Machine

US$19,000.00
1 Piece(MOQ)
Sample Available
EPE Foam Tube /Pipe /Profile Making Machine

EPE Foam Tube /Pipe /Profile Making Machine

US$38,000.00
1 Piece(MOQ)
Sample Available
EPE Foam Pipe/Rod Machine/LDPE Foam Pipe Machine

EPE Foam Pipe/Rod Machine/LDPE Foam Pipe Machine

US$19,000.00
1 Piece(MOQ)
Sample Available
EPE Foam Pipe Machine/Foam Profile FC-90

EPE Foam Pipe Machine/Foam Profile FC-90

US$15,000.00
1 Piece(MOQ)
Sample Available
Profile Makiing Machine. EPE Foam Pipe Machine

Profile Makiing Machine. EPE Foam Pipe Machine

US$20,000.00
1 Piece(MOQ)
Sample Available
EPE Foam Insulation Pipe Machine /PE Foam Pipe Machine

EPE Foam Insulation Pipe Machine /PE Foam Pipe Machine

US$19,000.00
1 Piece(MOQ)
Sample Available
EPE Foam Pipe Making Machine /PE Foam Tube Machine

EPE Foam Pipe Making Machine /PE Foam Tube Machine

US$15,000.00
1 Piece(MOQ)
Sample Available
Quality Gurantee PE Foam Pipe Making Machine/PE Foam Rod Machine

Quality Gurantee PE Foam Pipe Making Machine/PE Foam Rod Machine

US$15,000.00
1 Piece(MOQ)
Sample Available
EPE Foam Tube Making Machine /PE Foam Pipe Machine

EPE Foam Tube Making Machine /PE Foam Pipe Machine

US$15,000.00
1 Piece(MOQ)
Sample Available
EPE Foam Pipe Making Machine-PE Foaming Rod Machine

EPE Foam Pipe Making Machine-PE Foaming Rod Machine

US$10,000.00-15,000.00
1 Piece(MOQ)
EPE Foam Pipe Making Machine Algeria

EPE Foam Pipe Making Machine Algeria

US$10,000.00-15,000.00
1 Piece(MOQ)
30mm Diameter EPE Foam Pipe Making Machine-PE Pipe Foaming Machine

30mm Diameter EPE Foam Pipe Making Machine-PE Pipe Foaming Machine

US$10,000.00-15,000.00
1 Piece(MOQ)
Good Quality EPE Foam Pipe/Rod Making Machine

Good Quality EPE Foam Pipe/Rod Making Machine

US$10,000.00-15,000.00
1 Piece(MOQ)
EPE Foam Insulation Pipe PE Foam Tube/Pipe/Rod/Profile Extrusion Making Machine

EPE Foam Insulation Pipe PE Foam Tube/Pipe/Rod/Profile Extrusion Making Machine

US$10,000.00-15,000.00
1 Piece(MOQ)
EPE Foam PE Insulation Pipe/Rod Making Machine Foam Machinery Product

EPE Foam PE Insulation Pipe/Rod Making Machine Foam Machinery Product

US$10,000.00-15,000.00
1 Piece(MOQ)
EPE Foam Pipe/Tube/Rod/Stick/Profile Making Machine

EPE Foam Pipe/Tube/Rod/Stick/Profile Making Machine

US$10,000.00-15,000.00
1 Piece(MOQ)
EPE Foam PE Insulation Tube/Pipe/Rod Making Machine

EPE Foam PE Insulation Tube/Pipe/Rod Making Machine

US$10,000.00-15,000.00
1 Piece(MOQ)
EPE Foam Fruit Net/Pipe/Stick Making Machine

EPE Foam Fruit Net/Pipe/Stick Making Machine

US$20,000.00-25,000.00
1 Piece(MOQ)
Plastic EPE Foam Sheet/Pipe/Tube/Rod/Profile Extruder Making Machine

Plastic EPE Foam Sheet/Pipe/Tube/Rod/Profile Extruder Making Machine

US$10,000.00-15,000.00
1 Piece(MOQ)
EPE Foam Sheet Making Machine / PE Foam Net Pipe Extrusion Line

EPE Foam Sheet Making Machine / PE Foam Net Pipe Extrusion Line

US$10,000.00-15,000.00
1 Piece(MOQ)
Qingdao Huashida Machinery Co., Ltd.mic-icon
Satisfies 1/1 of your requirement
PE Spraying Foam Preinsulated Steel Pipe Making Machine

PE Spraying Foam Preinsulated Steel Pipe Making Machine

US$1,000,000.00-1,300,000.00
1 Piece(MOQ)
PUR Spraying Foam PE Wrapping Preinsulated Pipe Making Machine

PUR Spraying Foam PE Wrapping Preinsulated Pipe Making Machine

US$100,000.00-1,300,000.00
1 Piece(MOQ)
Machine for Making PE-Coated, Ppu Spray Foam Insulated Pipes for Heating and Cooling Water Systems

Machine for Making PE-Coated, Ppu Spray Foam Insulated Pipes for Heating and Cooling Water Systems

US$100,000.00-1,300,000.00
1 Piece(MOQ)
110mm-630mm PE Casing PU Foam Pre-Insulated Pipe Making Machine for District Heating Pipeline

110mm-630mm PE Casing PU Foam Pre-Insulated Pipe Making Machine for District Heating Pipeline

US$150,000.00
1 Piece(MOQ)
PU Foam Preinsulated District Heat Steel Pipe Making Machine

PU Foam Preinsulated District Heat Steel Pipe Making Machine

US$988,500.00-1,308,500.00
1 Set(MOQ)
Continue Flexible PUR Foam Pre-Insulation Pipe Making Machine

Continue Flexible PUR Foam Pre-Insulation Pipe Making Machine

US$143,000.00-234,500.00
1 Set(MOQ)
Pert / Pex Polyurethane Foam Insulation Pipe Making Machine

Pert / Pex Polyurethane Foam Insulation Pipe Making Machine

US$200,000.00-2,500,000.00
1 Piece(MOQ)
Continuous 48-325mm PU Foam Flexible Pre-Insulation Pipe Making Machinery

Continuous 48-325mm PU Foam Flexible Pre-Insulation Pipe Making Machinery

US$143,000.00-234,500.00
1 Set(MOQ)
One-Step Continuous Production Flexible Foam Insulated Pex Pipe Making Machine

One-Step Continuous Production Flexible Foam Insulated Pex Pipe Making Machine

US$210,000.00-420,000.00
1 Set(MOQ)
Polyurethane Foam and HDPE Jacket Plastic Pre Insulated Pipe Making Machine

Polyurethane Foam and HDPE Jacket Plastic Pre Insulated Pipe Making Machine

US$200,000.00-1,000,000.00
1 Piece(MOQ)
HDPE Jacket Casing Pipe Extrusion Line Vacuum Calibration Pre-Insulated PU Foam Outer Protective Pipe Making Machine

HDPE Jacket Casing Pipe Extrusion Line Vacuum Calibration Pre-Insulated PU Foam Outer Protective Pipe Making Machine

US$200,000.00-1,000,000.00
1 Set(MOQ)
Nitrile Rubber Foam Insulation Pipe/Sheet Making Machine for Copper Pipe Protect

Nitrile Rubber Foam Insulation Pipe/Sheet Making Machine for Copper Pipe Protect

US$400,000.00-550,000.00
1 Set(MOQ)
NBR PVC Rubber Foam Insulation Tube Pipe & Sheet Making Machine

NBR PVC Rubber Foam Insulation Tube Pipe & Sheet Making Machine

US$450,000.00-550,000.00
1 Piece(MOQ)
NBR EPDM PVC Rubber Foam Insulation Pipe Sheet Making Machine for Air Conditioning and Heating Systems

NBR EPDM PVC Rubber Foam Insulation Pipe Sheet Making Machine for Air Conditioning and Heating Systems

US$50,000.00-180,000.00
1 Piece(MOQ)
Rubber Foam Insulation Pipe Sheet Making Machine for Air Conditioning and Heating Systems

Rubber Foam Insulation Pipe Sheet Making Machine for Air Conditioning and Heating Systems

US$50,000.00-180,000.00
1 Piece(MOQ)

Sourcing guidance for Foam Pipe Making Machine

What are the key technical specifications to consider when selecting a Foam Pipe Making Machine?

When evaluating a foam pipe making machine, you must prioritize the extrusion capacity (kg/h) and the screw L/D ratio (typically 30:1 to 35:1) to ensure uniform melting and foaming. For PE/PU foam, check the foaming agent injection system for precision. Ensure the machine supports the specific pipe diameters and wall thicknesses required for your project, and verify that the cooling and sizing units are robust enough to maintain dimensional stability at high production speeds.

Which international compliance standards should the machine meet for cross-border trade?

For global procurement, the machine must carry the CE Marking for the European market or UL/ANSI standards for North America. It is critical to ensure the electrical components (PLCs, motors, and inverters) are from reputable brands like Siemens, ABB, or Schneider to guarantee electromagnetic compatibility (EMC) and ease of local maintenance. Additionally, verify compliance with ISO 9001:2015 for manufacturing quality management.

How does the choice of raw materials affect the machine configuration?

The machine configuration varies significantly depending on whether you are processing EPE (Expanded Polyethylene), NBR (Nitrile Butadiene Rubber), or PU (Polyurethane). EPE machines require a butane gas injection pump and anti-shrinking agent pumps, whereas NBR lines require specialized vulcanization ovens. Always confirm with the supplier if the screw design and heating zones are optimized for your specific polymer density and expansion ratio.

What are the typical usage scenarios and output capacities for industrial-grade foam pipe machines?

These machines are primarily used for producing HVAC insulation pipes, plumbing protective sleeves, and fitness equipment grips. High-efficiency lines can achieve speeds of 10–20 meters per minute. For B2B buyers, it is essential to match the output capacity with your downstream cutting and packaging speed to avoid bottlenecks in the production flow.

Cross-Border Procurement & Risk Management for Heavy Machinery

How can I mitigate the risk of receiving a machine that does not meet performance expectations?

Always mandate a Factory Acceptance Test (FAT) via video link or a third-party inspection agency like SGS or Intertek before final payment. Request a running video using your specific raw material samples. On Made-in-China.com, prioritize Audited Suppliers who provide comprehensive production capacity verification reports to ensure the factory actually exists and possesses the claimed technical expertise.

What are the best practices for negotiating shipping and installation terms?

Given the size of foam pipe lines, use CIF or DAP terms only if you have a reliable local customs broker; otherwise, FOB gives you more control over freight costs. Negotiate for on-site installation and commissioning or, at minimum, detailed video installation guides and 24/7 remote technical support. Ensure the contract specifies that critical wear parts (heaters, thermocouples, gaskets) are included as a free starter kit.

How should transaction security be handled for high-value industrial equipment?

Utilize Secured Payment services provided by reputable B2B platforms like Made-in-China.com to ensure funds are only released upon proof of shipment. Avoid direct wire transfers to personal accounts. Structure payments as 30% deposit and 70% against the Bill of Lading (B/L) or after a successful pre-shipment inspection to maintain leverage over the supplier.

What logistics precautions are necessary for shipping foam pipe making machines to international destinations?

Ensure the supplier uses vacuum packaging for the PLC cabinet and anti-rust oil on the screw and die head to prevent sea-salt corrosion. The main frame must be securely bolted to the container floor using steel wires and wooden blocks. Request a loading plan to ensure the equipment is distributed correctly within the container to prevent shifting during transit.

Related queries