SourcingAI

Crane 120 ton

I have found results from70000+products and30000+suppliers aboutCrane 120 ton

Commonly Used:
US$
—
Customization Available
Sample Available
Manufacturer First
Product Attributes:
Type: Folding
Type: Straight Arm
Type: Beam
Common Gantry Crane
Shipbuilding Gantry Crane
Type: Ordinary
Type: Top-Slewing Crane
Type: Under-Slewing Crane
Certification: GS
Condition: Used
Maximum Lifting Height: >40m
Maximum Lifting Weight: >16t
Shaft Number: 2
Crane Jib: Four-Arm
Operation Form: Cabin
Main Girder Form: Double Girder
Warranty: 1 Year
Installation: Jack-Up
Moving Type: Fixed
Certification: RoHS
Certification: CE
Certification: ISO9001
Certification: BV
Condition: New
Maximum Lifting Height: 30-40m
Maximum Lifting Height: 10-15m
Maximum Lifting Height: 15-20m
Maximum Lifting Height: >250m
Maximum Lifting Height: 150-200m
Maximum Lifting Weight: >200t
Maximum Lifting Weight: 8-10t
Maximum Lifting Weight: 50-100t
Maximum Lifting Weight: >10t
Shaft Number: 3
Crane Jib: Two-Arm
Crane Jib: Five-Arm
Operation Form: Ground Operation
Operation Form: Remote Control
Air Operation+Ground Operation
Main Girder Form: Single Girder
Installation: Assembled
Moving Type: Orbital

Sourcing guidance for Crane 120 Ton

What are the key technical specifications to evaluate when sourcing a 120-ton crane?

When procuring a heavy-duty crane, you must prioritize the Load Moment (kN.m) and the Main Boom Length. For a 120-ton capacity, ensure the hydraulic system utilizes high-pressure piston pumps for smooth operation. Verify the engine power (kW) and compliance with emission standards like Euro III or V depending on your local regulations. Additionally, check the outrigger span to ensure stability during maximum lifts.

Which international quality and safety standards are mandatory for 120-ton cranes?

The equipment must adhere to ISO 9001 for manufacturing quality. For specific safety compliance, look for CE Marking (Europe), ANSI/ASME B30.5 (USA), or GOST (Russia). Ensure the supplier provides a Load Moment Indicator (LMI) and an Anti-Two Block System as standard safety features to prevent structural failure or accidents during operation.

How can a buyer verify the structural integrity and durability of the crane?

Request documentation for Non-Destructive Testing (NDT) on critical welds and the boom structure. The steel used should be high-tensile strength steel (e.g., HG785 or equivalent). Ask for a 1.25x rated load dynamic test report and a 1.5x static load test report conducted by a third-party inspection agency to confirm the crane's structural limits.

What are the maintenance requirements for long-term operational efficiency?

A 120-ton crane requires a centralized lubrication system to reduce wear on moving parts. Buyers should ensure the supplier offers a comprehensive spare parts package (filters, seals, and sensors) for the first 2,000 hours of operation. Regular hydraulic oil analysis and wire rope inspections are critical to prevent downtime in high-intensity construction environments.

Cross-Border Procurement & Risk Management for Heavy Machinery

What are the primary risks when importing heavy machinery like a 120-ton crane?

The biggest risks include logistical damage during sea transit and non-compliance with local road regulations. To mitigate this, ensure the crane is shipped via Ro-Ro (Roll-on/Roll-off) or Flat Rack containers with professional lashing. Always verify the axle load limits of your destination country to ensure the crane can be legally driven or transported on public roads.

How should I negotiate payment and transaction security with international suppliers?

For high-value assets, use Letter of Credit (L/C at sight) or Escrow services provided by reputable platforms like Made-in-China.com to ensure funds are only released upon proof of shipment. Avoid 100% upfront payments; a standard structure is 30% deposit and 70% against the Bill of Lading (B/L) after a successful Pre-Shipment Inspection (PSI).

What strategy should be used for shipping and customs clearance?

Utilize Incoterms 2020 - CIF (Cost, Insurance, and Freight) if you want the supplier to handle the main transit, but FOB (Free on Board) is preferred if you have a trusted forwarder who specializes in Oversized/Overweight (OOG) cargo. Ensure the supplier provides a Certificate of Origin to potentially benefit from Free Trade Agreements (FTA) and reduce import duties.

How do I ensure effective after-sales support for a product located in a different country?

Prioritize suppliers who have local service centers or authorized dealers in your region. If not available, negotiate for Remote Technical Support via AR/Video and a contract clause that mandates the dispatch of engineers within 72 hours for critical failures. Confirm that the PLC software is provided in English and that you have access to the system's diagnostic codes.

Related queries