
Sfz7.6-21 Manual Operated Single RAM Sucker Rod Bop (Blowout Preventors)

Sfz7.6-14 Manual Operated Single RAM Sucker Rod Bop (Blowout Preventors)

3" Opening Manual Operated Single RAM Sucker Rod Bop (Blowout Preventors)

I have found results from400+products and200+suppliers aboutManual bop blowout preventer











































































































































Buyers must prioritize Working Pressure (WP) ratings, typically ranging from 2,000 psi to 15,000 psi, ensuring they match the wellhead pressure requirements. The Bore Size must be compatible with the casing program (common sizes include 7-1/16", 11", and 13-5/8"). Additionally, verify the Temperature Rating (API 6A classifications like L, P, U, or T) to ensure the elastomers can withstand specific downhole environments.
The gold standard for BOP manufacturing is API Specification 16A (Specification for Drill-through Equipment). Ensure the supplier holds a valid API 16A Monogram. For sour gas environments, compliance with NACE MR0175/ISO 15156 is essential to prevent sulfide stress cracking. Furthermore, check for ISO 9001 certification to guarantee consistent quality management systems.
The body should be constructed from high-strength forged or cast alloy steel (such as AISI 4130) with proper heat treatment. Request Material Test Reports (MTRs) to verify chemical composition and mechanical properties. For the sealing components, ensure the Ram Rubbers are made of high-performance elastomers tested for compression set and abrasion resistance.
Every unit must undergo a Hydrostatic Shell Test at 1.5 times the rated working pressure and a Low-Pressure/High-Pressure Seat Test to ensure zero leakage. Request a Function Test to verify the manual locking mechanism operates smoothly and that the ram travel distance meets design specifications. All test results should be documented in a Final Data Package (FDP).
The main risks include non-compliance with local safety regulations and damage during transit. To mitigate this, use third-party inspection services (like SGS or BV) to conduct pre-shipment inspections. Ensure the equipment is packed in seaworthy steel-framed crates with anti-corrosion coatings (VCI) to prevent rusting during long-term sea freight.
Focus on Total Cost of Ownership (TCO) rather than just the unit price. Negotiate for extended warranty periods (18-24 months) and the inclusion of critical wear-part kits (seals and gaskets) in the initial purchase price. For large orders, suggest a staged payment plan linked to production milestones: 30% deposit, 60% after successful FAT (Factory Acceptance Test), and 10% after arrival.
Utilize secure payment methods such as Irrevocable Letters of Credit (L/C) or trade assurance services provided by reputable platforms like Made-in-China.com. This ensures that funds are only released when the supplier provides Bill of Lading and Quality Inspection Certificates, protecting the buyer from non-delivery or sub-standard goods.
Due to the extreme weight and dimensions, BOPs often require Open Top containers or Flat Racks. Ensure the supplier provides an accurate Packing List with Center of Gravity (CoG) markings for safe lifting. Verify that the shipping agent is experienced in Class 9 or heavy machinery logistics to handle customs clearance for specialized oilfield equipment efficiently.