Wholesale used steam turbine
I have found results from50000+products and10000+suppliers aboutWholesale used steam turbine
Refurbished Steam Turbine 1MW-60MW Used Steam Turbine with Generator for Sale
Used 1MW-60MW High Efficiency Steam Turbine Generator Set for Sale
Industrial Used Solar Titan 130 Pg Gas Turbine with Steam Cogeneration
Titan 130 Pg Used Gas Turbine Generator Combined with Steam
Waste Heat Recovery Power Generation/ Steam Turbine for Power Plant
Used Steam Turbine Generator 100kw Steam Turbine for Electricity Power Plants
High Efficiency Long Time Used Low-Pressure Steam Turbine for Industrial Power Plants
1MW 2MW 3 MW Steam Turbine Power Plant for Textile Mills (New or Used Units)
Used Condensing Steam Turbine for Power Plant 3MW/4MW/4.5MW/5MW/6MW/12MW/16MW/20MW
Back-Pressure Industrial Steam Turbine for Driving Pumps (T530)
High-Efficiency Back Pressure Steam Turbine Generator for Power Generation (T580)
Condensing Steam Turbine Generator for Waste Heat Power Generation (T710)
1MW Condensing Steam Turbine for Power Generation (T562-1)
New and Used Steam Turbine Sets for Power Plant and Power Station
6MW Used Steam Turbine for Power Plants in Sugar Mill, Textile Mill, Paper Mill
Used 6MW Steam Turbine for Power Plant, Sugar Mill, Textile Mill
50MW Used Steam Turbine for Steel, Cement, Mining, Chemical, Textile, Paper
1.5MW Used Steam Turbine for Power Plants in Sugar, Textile, Food, Chemical
25MW Used Steam Turbine for Captive Power in Cement, Textile Mill, Paper Mill
15MW Used Steam Turbine for Power Plants in Steel, Cement, Paper, Textile, Sugar, Food
1.5MW Used Extraction Steam Turbine Price for Power Plant
12MW Used Steam Turbine in Cement, Steel, Mining, Paper, Textile, Sugar Mill
3MW Used Steam Turbine for Power Plant in Paper, Textile, Sugar, Chemical
7.5MW Used Steam Turbine for Power Plant, Sugar Mill, Biomass Plant
Used 15MW Extraction Steam Turbine Quotation
25MW Used Steam Turbine for Steel, Cement, Paper, Textile, Sugar, Chemical
Sourcing guidance for Wholesale Used Steam Turbine
How to evaluate the technical condition of a used steam turbine?
When sourcing used steam turbines, the most critical factor is the residual service life of the rotor and blades. You must request Non-Destructive Testing (NDT) reports, specifically ultrasonic and magnetic particle inspections, to check for stress cracks. Verify the total running hours and the number of start-stop cycles, as frequent thermal cycling significantly impacts metal fatigue. Ensure the original technical manuals and maintenance logs are available to confirm that all scheduled overhauls were performed by qualified engineers.
What are the key specifications to match for industrial compatibility?
To ensure the turbine fits your power plant or factory requirements, you must align the Inlet Steam Pressure (bar/psi) and Inlet Steam Temperature (°C/°F) with your existing boiler output. Additionally, confirm the Rated Power Output (MW/kW) and the Rotational Speed (RPM). If the turbine is used for power generation, the Generator Frequency (50Hz vs 60Hz) must match your local grid standards. For cogeneration setups, verify the Extraction Pressure levels for process steam requirements.
What compliance and safety standards should be verified?
Used pressure-retaining components must adhere to international standards such as ASME Section VIII (BPVC) or CE/PED (Pressure Equipment Directive). Ensure the turbine's Governor System (mechanical or digital) is functional to prevent overspeed scenarios, which are catastrophic. If you are sourcing via Made-in-China.com, look for suppliers who provide SGS or TÜV Rheinland third-party inspection certificates to validate the equipment's safety status before shipment.
How to ensure economic feasibility when buying used vs. new?
A used steam turbine should typically cost 40% to 60% less than a new unit. However, you must calculate the Total Cost of Ownership (TCO), including the cost of refurbishment, spare parts procurement (seals, bearings), and specialized rigging/transportation. If the turbine requires a proprietary control system upgrade (e.g., upgrading from analog to DEH - Digital Electro-Hydraulic control), factor this into your initial investment budget.
Cross-Border Procurement Risks and Strategies for Heavy Machinery
What are the primary risks in international used machinery transactions?
The biggest risk is hidden mechanical defects that are not visible in photos. To mitigate this, always hire a third-party inspector to witness a 'barring gear' test or a trial run if possible. Another risk is corrosion during sea freight; ensure the supplier uses VCI (Volatile Corrosion Inhibitor) packaging and heavy-duty vacuum sealing to protect the precision-machined surfaces of the rotor and journals from salt air.
How should I negotiate with suppliers on Made-in-China.com?
Focus your negotiation on Performance Guarantees rather than just the sticker price. Demand a warranty period (typically 6-12 months) on major rotating parts, even for used equipment. Negotiate for the inclusion of critical wear-and-tear spare parts (like carbon seals and gaskets) in the final price. Use Escrow-based payment terms or Letters of Credit (L/C) to ensure funds are only released upon verification of the Bill of Lading and inspection reports.
What are the logistics considerations for shipping a steam turbine?
Steam turbines are Out-of-Gauge (OOG) cargo and require specialized shipping. You will likely need Flat Rack containers or Breakbulk shipping. Ensure the supplier provides a detailed Packing List with center-of-gravity markings for safe lifting. Confirm the Incoterms clearly; CIF or DAP is often preferred for heavy machinery so the seller handles the complex export permits and heavy-lift loading at the port of origin.